On Its Way Out…

The old booths in Simul Lab 1 are packed up and ready to move. After this picture was taken, the carpet was removed in preparation for installing electrical outlets in the floor.  Over the course of the summer, the old Simul 1 will become the new MML, while the old MML will house a revitalized Simul 1 Lab with new equipment and refurbished booths.  Thanks to Dean Bao, John Grunder, Jonathan Covell and their staffs for collaborating on this project.

Website Design Unveiled

White Whale, the website design firm, will be unveiling preliminary design concepts for the new MIIS website to our community on June 9th at 1 pm in B 104.  Everyone is welcome to attend this event and feedback on the new design is encouraged.

Grand Unveiling